Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3490 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
免费观看BBB毛片大全 | 69久蜜桃人妻无码精品一区 | 老熟妇一区二区三区啪啪 | 无码免费一区二区三区电影 | 久久99国产精品一区二区 | 女人裸体不穿衣服18禁露私处91传媒 | 国产精品 同 | 人人澡人人澡人人妻人人四虎 | 精品少妇爆乳无码a在线观看 | ●苍井そら无码流出videos | 成人做爰www免费网站 | 精品国产一级A片免费看奶水多多 | 亚洲天堂在线观看视频 | 北条麻妃在线一区二区免费播放 | 国产又粗又长又白又大 | 色欲av伊人久久大香线蕉影院 | 国产精品人妻无码久久久久 | 午夜精品久久久久久久爽 | 精品爽爽久久久久久蜜臀黑人 | 成人做爰黄级爽爽视频直播网 | 又大又长又粗一级视频 | 搡老女人老91妇女老the熟女 | 国产人妻人伦精品1国产丝袜 | 波多野结衣一区二区三区在线观看 | 美女直播视频亚洲天堂 | 国产高清对白在线观看视频 | 成人精品视频99在线观看免费 | 成人小视频免费观看 | 国产AV 无码 乱噜噜 | 特级西西444www无码视频 | 午夜大尺度色无码专区 | 樱花视频A片成人免费播放 欧美性猛交XXXX黑人交 | 摸BBB揉BBB添BBB | 亚洲大成色WWW永久网站自慰 | 黄色视频在线免费无码观看 | 极品白丝自慰喷水流白浆软件 | 高潮毛片又色又爽免费 | 免费无码婬片AAAA片直播深 | 国产一级a人与一级A片观看 | 黄视频在线观看官网 | 免费国产又色又爽又黄的网站 |