Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014/7/29 18:16:55 Read: 3637 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
av无码专区在线观看成人 | 亚洲色欲色欲www在线成人网 | 亚洲AV成人无码18禁在线 | 国产一级特黄a高潮片 | 日本亲近相姦中文字幕特级毛片 | 国产精品久久久久久无码不卡 | 国产海角精品秘 入口福利一姬 | 人人妻人人澡人人爽人人DⅤD | EEUSS鲁丝片一区二区三区不卡 | 在线永久免费观看黄网站 | 欧美囗交口爆吞精在线视频 | 国产小视频在线播放 | AV一区二区三区一杨思敏 | 国产伦精品一区二区三区香蕉APP | 国产成人天码免费视频 | 亚洲精品久久久久久久久豆 | 免费添女人囗交做爰视频 | 中文字幕乱偷在线无码少林寺 | 国产日韩精品无码区免费专区国产 | 99久久久无码国产精品免费四季 | 小嫩BBBBBBBBB视频| 红桃视频成人A片免费播放 国产91 丝袜在线播放 | 国产精品理伦天美传媒 | 熟女人妻一区二区三区蜜臀AV | 蜜臀av夜夜澡人人爽人人 | 国产亲子伦XXXXX熟妇视频app | 精品少妇无码AV无码专区 | 精品国产污污免费网站入口 | 极品粉嫩小仙女小泬 | 亚洲AV秘 无码一区明步 | 90岁老太婆A片免费播放 | 欧美freesex 交免费视频 | 国产精品一区人妻精品阁在线 | 视频在线观看免费高清黄视频在线观看 | 久久人人爽人人爽人人片亚洲 | 真人強姦外女毛片破處在线看 | 狂野欧美性猛交XXⅩ大乱3超A | 成人黄色视频在线观看免费 | 在线观看 禁无码精品 | 国产精品扒开腿做爽爽爽日本无码 | 免费A级毛片无码无遮挡 |